Step | | Procedure & Parts & Tools |
1 |
|
REMOVE THE 14 SCREWS HOLDING THE BACK OF THE HANDLE.
Screwdriver-phillips |
|
|
2 |
|
LIFT UP ON THE BACK OF THE HANDLE TO SEPARATE IT FROM THE FRONT OF THE HANDLE.
|
3 |
|
REMOVE THE 3 SCREWS HOLDING THE CONTROL BOARD.
Screwdriver-phillips |
|
|
4 |
|
LIFT UP ON THE CONTROL BOARD TO LOCATE THE RIBBON CABLE.
|
5 |
|
PUSH IN ON THE 2 WHITE TABS AND GENTLY PULL THE RIBBON CABLE FROM THE CONTROL BOARD.
|
6 |
|
FLIP THE CONTROL BOARD OVER. REMOVE THE BOLTS HOLDING THE WIRES.
Wrench-Allen metric 4.0mm |
|
|
7 |
|
LIFT UP ON THE RING CONNECTORS TO REMOVE THEM FROM THE CONTROL BOARD.
|
8 |
|
REMOVE THE 2 SCREWS HOLDING THE BATTERY CHARGER CABLE TO THE CONTROL BOARD.
Screwdriver-flat tip |
|
|
9 |
|
REVERSE STEPS 1 THRU 8 TO INSTALL A NEW CONTROL BOARD AND TO REASSEMBLE THE MACHINE.
|